Project size

2000m²

Project duration

6 weeks

Project location

London | SE14

Services delivered

Restoration & Roofing

Elizabeth Industrial Estate

Howard Group is a leading property and business investment and development firm. They approached Price for support with a large scale roofing project at one of their privately owned business parks; Elizabeth Industrial Estate in Lewisham.

The company required the complete removal of an existing asbestos roof followed by a replacement roof with metal cladding. The project had to be completed under tightly controlled conditions due to the health risks associated with the asbestos. We were chosen for our experience of the safe removal of the material and were able to fully mitigate all risks to our workforce throughout the project.

Robust Solution

Following the removal of the existing roof, we constructed a new metal cladded roof using 80ml pre-insulated composite to provide a heat-saving, energy-efficient, and robust solution for the whole Estate. The huge roof project was followed by a number of additional services and we went on to provide Howard Group with a range of metalwork, internal preparation and decoration services.